Harrison County, Texas
Loading Problems
Harrison #1
This well is a good example of the increase in production
rate by the GasJack™ compressor over that of a competitor’s screw
compressor. The screw compressor operating on location had failed to stem
the decline of this well due to loading problems and was replaced with a Gas
Jack™ compressor which alleviated liquid loading and enabled the well
to remain profitable.
337% Increase in Production Rate

